GTS Storage Capacity Requests

Facility
Currently under construction, Golden Triangle Storage (GTS) will be a twelve (12) million Dth (working gas capacity) salt dome storage facility consisting of two (2) caverns each with six (6) million Dth of working capacity. Upon completion, GTS will have a pipeline header approximately nine (9) miles in length, providing 300,000 Dth/d of injection capacity and 600,000 Dth/d of withdrawal capacity. The GTS Pipeline Header system will contain six (6) large capacity, interstate/intrastate pipeline interconnections.

GTS Interconnect Total Nominal Meter Capacity Meter Functionality
Florida Gas Transmission (Zone 1) 250,000 Dth/d Bi-directional
Texas Eastern Transmission (W. La.) 250,000 Dth/d Bi-directional
Houston Pipe Line Company 250,000 Dth/d Bi-directional
Golden Pass Pipeline 250,000 Dth/d Bi-directional
Kinder Morgan Texas Pipeline 100,000 Dth/d Bi-directional
Centana Intrastate Pipeline 100,000 Dth/d Bi-directional

 

Golden Triangle Storage, Inc. (“GTS”) is an interstate pipeline/storage facility and natural gas company subject to FERC jurisdiction under section 7(c) of the Natural Gas Act. GTS received the following certificate authorization from FERC on December 31, 2007, under Docket Nos. CP07-414-000, CP07-415-000, and CP07-416-000.

Process Information and Guidelines
Click here for complete procedures: GTS RFI Procedures 

Request Form
Click here for the bid form: GTS Request Form
Please submit a separate form for each bid

GTS Facility Configuration
Click here for: GTS Interconnections and Configuration

FERC Gas Tariff
Click here to access the GTS FERC Gas Tariff

Form Agreements
Please refer to FERC Gas Tariff above.

Additional information about Golden Triangle Storage >

Contacts
John Pellegrin, General Manager, Commercial Operations
832-397-3881 jpelleg@aglresources.com